Contracting authority : DARS d.d.
The contracting authority has signed a contract for the establishment of free traffic flow for vehicles equipped with a vignette at the Dob front toll station. In the framework of the project, all installation lines were rearranged and the shelter roof was reinforced before commencing demolition works. Then, the following works were carried out:
1.) demolition of two toll islands (D and F):
- removal of traffic equipment and traffic security equipment
- removal of two toll booths
- removal of four anti-collision columns
- removal of the top concrete slab
- removal of the shafts in the island
- removal of anti-collision embankments
- removal of absorbers
2.) construction of the upper structure:
- unbound bearing layer
- bound bearing layer
- protective barrier layer
3.) installation of new traffic signs:
- horizontal traffic signs
- vertical traffic signs