Contracting authority: DARS d.d.
Within the framework of the contract, we completed the outstanding works and eliminated the deficiencies after the termination of the contract concluded with previous contractors. The implementation deadline was one month. The works were executed in June 2013 and included:
1.) ground works:
- excavations works and the construction of dykes
- adding humus to the soil and grassing
- lining the rainwater drainage ditches with concrete slabs and quarry stone
- horticultural arrangement
2.) installations:
- waterworks
- medium-voltage connection installed in pipes with a supporting frame under the motorway
- telecommunication connection installed in pipes
3.) elimination of deficiencies in the final phase of the project:
- refurbishment of the overpasses and underpasses
- elimination of deficiencies in public lighting
- execution of all measurements
- manufacture of missing traffic equipment
- acquisition and elaboration of all missing technical documentation
- performed technical inspection and obtained operating permit