Contracting authority: DARS d.d.
The project included the demolition of the Fram and Dramlje toll booths:
- demolition of the toll booths and associated infrastructure
- rearrangement of public lighting – electrical installation works
- reconditioned horizontal and vertical traffic equipment.
Apart from the demolition, there was also a carriageway reconstruction carried out at the Dramlje junction:
- rehabilitation of the local infrastructure
- reconstruction of the junction to the main road
- construction of a bituminized protective and blocking layer
- production of traffic equipment.